Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk Pond B <br />NPDES ID. No.: None <br />Inspection Period: Fourth Quarter 2006 <br />Inspection Date: 12/26!06 <br />General Description or Reference to Site Plan: <br />Pond 6 is anon-discharging facility designed to contain plant processing water. The plant has <br />been idle since 1996 and the pond is now used to dewater other ponds prior to clean-0ut <br />1). Adequacy of the vegetative cover. Excellent Moderate ~ Poor <br />2). Erosion forming Gullies: Extensive Some ~ None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes No <br />4). Erosion of the downstream hoe of the embankment? Yes No <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instablity7 <br />No <br />~~ <br />l~ <br />v <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />No p/ <br />OTHER OBSERVATIONS: <br />~U <br />SHA Qualified Impoundment I pector <br />,~/a~fa~ <br />Date ~ <br />