Laserfiche WebLink
STATE OF <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, Colorado 80207 <br />Phone: 13031 866-3567 <br />FAX: 13031 8328106 ~ F r F I ~/ F D <br />utt, 1 2 1994 <br />LIMITED IMPACT OPERATION (110) <br />RECLAMATION PERMIT Division O1 Minerals ~ Neology <br />APPLICATION PACKAGE <br />4 ~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />James 5. Lochhead <br />E.ecutive Director <br />Michael B. long <br />Division Director <br />AuollCab111tV: <br />This application package ie for a mining operation that ie not a Designated Mining Operation, <br />affecting less than 10 acres and extracting less than 70,000 tone of mineral, overburden or <br />combination of the two per calendar year. If you plan to conduct a mining operation which <br />meets these criteria, please follow the instructions provided in this package and Rules <br />1.4.1, 1.4.2, and 6.0, ae required, in the Mineral Rules and Regulations. Please see Rule <br />1.1(12) for the definition of "Designated Mining" operation. <br />Filing Reoui rements: <br />The Mineral Rules and Regulations (the Mined Land Reclamation Act, Section 34-32-101, <br />et aec., C.R.S., and 2 CCR 407-1) of the Colorado Mined Land Reclamation Board (the "Hoard") <br />regulate the permitting, operational and reclamation requirements for all non-coal mining <br />operations in Colorado. It ie your obligation to comply with the Act and Regulations. You <br />are encouraged to obtain and review a copy of the Rules, available for S8.00 from the <br />Division of Minerals and Geology (the "Office"). In order to submit your application <br />properly, it ie recommended that you review the Act and: <br />Rule 1.1 Definitions; <br />Rule 1.4.1 General Provisions of the Application Review and Consideration Process; <br />Rule 3.1 Reclamation Performance Standards; <br />Rule 3.3.1 Operating without a Permit - Penalty; <br />Rule 4 Performance Warranties and Financial Warranties; <br />Rule 6 Permit Application Exhibit Requirements; <br />Rule 6.3 Specific Permit Application Exhibit Requirements; <br />Rule 6.4.19 8xhibit S (ae required); and <br />Rule 6.5 Geotechnical Stability Bxhibit; <br />To apply for a Reclamation Permit for a Limited Impact Operation, one (1) signed and <br />notarized original and one (1) copy of the Limited Impact Operation (110(2)) Application <br />Form, two (2) copies of Hxhibite A-J, any required sections of Exhibit S and Geotechnical <br />Stability 8xhibit, ae required, and outlined in Rules 6.1, 6.2, 6.3, 6.4.19 and 6.5, and an <br />application fee MOST be submitted to the Office. The thirty (30) day period for review of <br />the application and exhibits will NOT begin until all required information ie submitted. The <br />Office will then review the submitted information for adequacy. <br />It is recommended that you contact the agencies listed under "ComDli ante With Other Laws" <br />prior to submitting the application to the Office You must send a notice, on a form <br />