Laserfiche WebLink
<br />Denver Engineering Corporation <br />1828 Cole Boulevartl. Suite 300. Building 7 Goltlen. Colorado BOa01 1303) 233-0533 Teiex RB88230 <br />TEST/INSPECTION REPORT #B-A-I <br />GOLD HILL MILL--TAILINGS POND <br />November 11, 1985 <br />1. Tailings Pond: <br />The tailings pond was constructed per the plans and <br />specifications as set forth in the Application Amendment, Cash <br />Mine, File #M-83-141, Re: Map E2, Pages 28, 29. <br />All soils were compacted to 95B per the modified proctor, <br />A. S.T. M, designation. The reservoir bottom was excavated to bed- <br />rock, in preparation for the installation of the membrane liner. <br />2. Septic System: <br />A complete inspection of the installation of the septic tank and <br />leech fields were conducted and all materials, tests and <br />installations were found to be satisfactory and in compliance <br />with the plans and specifications. <br />3. Hazel A Ad it: <br />A complete review and inspection was conducted on the bulkhead- <br />dam for the water storage reservoir. All materials and <br />installations were found to be satisfactory and in compliance <br />with the Division of Mined Land Reclamation requirements--see <br />attached drawing. <br />Planning Engineering Construction Management Surveying <br />