Laserfiche WebLink
Sfipulation No. 2 <br />Prior to discharge of mine water into existing ditches, the applicant will obtain approval from the <br />Division of Minerals and Geology for a ditch stabilization and erosion control plan in the form of a <br />revision to the permit. <br />Stipulation No. 3 <br />Deleted in its entirety by Board. <br />Stipulation No. 4 <br />In order to maintain phased bonding for the clay liner, the following permit conditions must be <br />followed: <br />• The applicant shall not mine Pond 2 below the groundwater table until Pond 1 is reclaimed <br />to two feet above the groundwater level. <br />• The applicant must begin construction of the slope liner no later than after two phases have <br />been completely mined to bedrock. . <br />• The maximum linear feet of slope liner that may be disturbed and not reclaimed aZ any given <br />time shall be no greater than 6,000 lineal feet. <br />• Prior to construction of the compacted clay liner, the applicant shall submit a revision to the <br />permit with detailed information on construction of the compacted clay liner and submit a <br />quality control and assurance plan for the Division's review and approval. A copy of the <br />revision shall be forwarded to the Colorado Department of Transportation (CDOT) when <br />submitted to the Division of Minerals and Geology. <br />• The applicant shall submit and obtain approval from the Division of construction reports on <br />clay-lined slopes that have been completed in order to initiate the next 6, 000 lineal feet of <br />mining. <br />• Final release of the clay liner must be obtained from the Off ce of the State Engineer in order <br />for the Division to release any remaining reclamation bond. <br />Stipulation No. 5 <br />The applicant will construct perimeter berms, as shown on the mining and reclamation plans, at the <br />beginning of each respective mining phase. The berms shall be seeded with the specified seed mix in <br />the fall or the spring. Tl:e applicant shall install irrigation, trees and shrubs as soon as it is feasible <br />after the berms have been constructed. Plantingfor deciduous trees shall occur prior to October I5`" <br />and after March I S`". Planting for evergreen trees shall occur prior to October 1"and after March <br />I5`h. <br />