Laserfiche WebLink
` ~ (~S L~ STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER r~n <br />Division of Water Resources /J ~ ~.oe~c <br />Department of Natural Resources /J J C~ ~ v~5~a=' <br />»~ <br />1313 Sherman Street, Room 818 ~C~'IVED <br />Denver, Colorado 80203 'rage' <br />Phone (303) 866-3581 EP n 4 2007 <br />FAX (303) 866-3589 <br />Big Ritter, Jr. <br />httpJ/www.watecstate.co.us ~ DIVISIDn u~ r.a~~mnanon, Governor <br />Mining and Safely <br />Hams D. Sherman <br />Executive Director <br />DATE: September 4, 2007 <br />(vacant) <br />TO: Berhan M. Kefelew, Environmental Protection Specialist State Engineer <br />CC: Division 2 Office; District 67 Water Commissioner <br />FROM: Clay Kimmi, P.E. I/ <br />RE: Buffalo Stone Quarry, File No. M-2007-030 <br />Operator: Yocam Stone LLP <br />Contact: Monty Yocam (719) 643-5317 <br />Section 35, Twp 30S, Rng 51 W, 6th P.M., Las Animas County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />/~OMMENTS: <br />