Laserfiche WebLink
Pond_ <br />Date of I <br />DES No. _~~- __ <br />Z <br />EMBANKMENT. C~j,~jsE'~, <br />1. Adequacy of the vegetative cover: Excellent, Moderate, <br />2. Erosion forming gullies: Ea4ensive; Some, ery~ <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes <br />At the principal spilhvay inlet? ~ 5/~~ Yes <br />4. Erosion of the downstream toe of the embankment? <br />The cause of [he erasion is attributed to: <br />5. Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />E:cplain: jy~ <br />PRINCIPAL SPILLWAY ~'~ ~,yy(~py <br />1. Is the princpal spillway system m a~orking rde:? <br />2. Is the inlet fret of debris and restrictive material? <br />Yes No <br />Yes No <br />3. Is the discharge outlet free of restrictive material^ Yes No <br />~. Is erosion occturing at the discharge outlet.' Yes No <br />Evaluate Che severity; E.ctensive V[ode:ate Just ~[aruns ~~one <br />EMERGENCY SPILLWAY {~j/d ~~~ - <br />I. Is the overall eme: send spilhvay rystem capab e of passing design storm discharge' <br />Yes ~o <br />?. Does it appear as if the eme:gene: spilhvay has discharged ware: since the last inspection? <br />Yes No <br />;. Is erasion occurring at any section of the emergeac+ spilhvay^ Y'es No <br />Describe the extent. <br />SEDIMENT STORAGE CAPACITY <br />1. fins the design storage capacin~ of ;heaese:voir been ;uroassed^ Yes <br />Yves.eenlmn: /~- ~ ~4 ~Y•e:~; ~ ,8.~.,~; <br />Yes <br />Yes <br />Yes <br />Poor <br />Nona <br />No <br />No <br />No ~ <br />No <br />No <br />Please add any special comments toncernin; potentially dan,erous problems ao the buck of this <br />sheer! ' <br />Inspected by:~/~ ~~^ Z" <br />