Laserfiche WebLink
t ~, ~~~ f J _ <br />~ t <br /> <br /> ' <br />f / _ r <br /> <br /> <br /> <br /> <br />~ <br />( `r <br />~ <br />' <br />- <br />;~ ;' SED FORM <br />INSPECTION <br />IMENTATION POND <br />Pond ~~ P~~ ~~iCG-~r,~irv-x•~ ~ ~ NPDES No. ~~~" <br />Date of Inspection ~~~ ~ "/O Z l= jo ~f ~ <br />EMBANKMENT-- <br />1 Adequacy of the degetahve cover xcellen Mod_ emfe, Few Poor <br />r. 2 Erosion forming gulhes: " ' Extensive; Some, _ ery Few, None " <br />3.: Is wave action causing erasion: <br />On the upstream embankment? Yes No ~/ <br />- A[ the principal spillway inlet? ~{/j ,5/ (~~/ Yes No <br />4. Erosion of the downstream toe of the embankment? <br />"The cause of the erosion is attributed [o: <br />Yes No G~ <br />5. Is seepage occurring through the dam? Yes No Ci <br />Could this seepage cause potential instability? Yes No <br />Explain: <br />PRINCIPAL SPILLWAY /qv~~ <br />1. Is the principal spillway system in worly~ o~~ Yes No <br />2. Is the inlet free of debris and restrictive material? Yes No <br />3. Is the discharge outlet free of restrictive material? Yes No <br />4. Is erosion occurring at the discharge outlet? Yes No <br />Evaluate the severity: Extensive Moderate Just Suutine None <br />EMERGENCY SPILLWAY ~~ 5 (~ <br />1. Is the overall emergency spillway sys" tem cap ble of passimsign storm discharge? <br />Yes No <br />2. Does it appear as if the emergency spillway has discharged water since the last inspection? <br />Yes No <br />3. Is erosion occurring at any section of the emergency spillway? Yes No <br />Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design stomg~ capacity of the reservoi,I been surpassed? <br />c~ <br />Please add any special comments concerning potentially dangerous problems oa the back of this <br />sheet! <br />Inspected by: ~ ~ <br />