Laserfiche WebLink
<br /> <br />~.. <br />'; <br />:., <br />SEDIMENTATION POND I NSPECTION FORM <br />Pond ft/er-~ ~~ i2~U~ _ NPDES No. O~i4~ <br />Date of Inspection j1/~ ~ ~ )!rf _ ~-1°1~bZ _ __ ,_~ <br />EMBANKMENT- <br />I. Adequacy of [he vegetative cover: Excellent, odes Few, Pour <br /> <br />2. Erosion forming gullies: - Extensive; Some, ~ ery Fey ~, None <br />3. Is wave action causing erosion: <br />On [he upstream embankment? Yes No ~" <br />At the principal spillway inlet? Yes No i <br />4. Erosion of [he downstream toe of the embankment? Yes No L- <br />The cause of the erosion is attributed [o: <br />5. Is seepage occurring through [he dam? Yes No ~ <br />Could this seepage cause potential insmbility? Yes _ No <br />Explain: <br />PRINCIPAL SPILLWAY <br />1. Is the principal spilhvay system in working order? Yzs ~- No <br />2. Is the inlet free of debris and restrictive material? Y'es c~ No <br />;. Is the discharge outlet free of restrictive material? <br />Yes ~_ No <br />~ Is erosion occurring at the discharge outlet" Yes No ~-- <br />Evaluate the severirv: Extensive Moderate Just S[arting Vone <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge'.' <br />Yes ~_ No <br />?. Does it appear as if the zmergency spillway has discharged water since the last inspecuon? <br />Yes No i_ <br />3. Is erosion occurring at any section of the emergency spilhvay? Yzs No ~ <br />Describe ckte zxtent: <br />SEDIMENT STORAGE CAPACITY <br />L Has the design storage capacity of the reservoir been surpassed'.' <br />If yes, explain: <br />Yes No C. <br />Please add any special comments concerning po[entially dangerous problems oo [he back of this <br />sheet' <br />Inspected bv: ~ i.~...~-- <br />