Laserfiche WebLink
Memo to Russ Means 9 November 14, 2007 <br />Whirlwind Mine Bulkhead Costs File No. M-2007-044 <br />Task and Cost Item Quantity Extended Cost <br />Set Rebar Anchors and Fine Site Cleaning <br />Decline Bulkheads (both) <br />1.25 yard Load Haul Dump <br />Pack Rat <br />$35/hr. x 10.5 hrs. x 2 x 1.5 <br />$1102.50 <br />1.25 yard Load Haul Dump <br />$35/hr. x 18.5 hrs. x 1.5 <br />$971.25 <br />Build Forms, Set Pipes, Valves, and Rebar, Divert Water <br />All Whirlwind Bulkheads <br />1.25 yard Load Haul Dump <br />$35/hr. x 85.6 hrs. x 3 x 1.5 <br />$13,482.00 <br />Set Up and Pour Bulkhead <br />Decline Bulkheads (both) <br />1.25 yard Load Haul Dump <br />Forklift <br />Pack Rat <br />1.25 yard Load Haul Dump <br />Forklift <br />$35/hr. x 21 hrs. x 2 x 1.5 <br />$20/hr. x 21 hrs. x 2 x 1.5 <br />$35/hr. x 38 hrs. x 1.5 <br />$20/hr. x 38 hrs. x 1.5 <br />$2205.00 <br />$1260.00 <br />$1995.00 <br />$1140.00 <br />Strip Forms, Move Equipment, and Grout Bulkhead <br />All Whirlwind Bulkheads <br />1.25 yard Load Haul Dump <br />$35/hr. x 128.4 hrs. x 3 x 1.5 <br />$20,223.00 <br />Miscellaneous Costs <br />All Whirlwind Bulkheads <br />Compressor usage $3000 x 3 x 1.5 <br />Air Bean 25 pump usage $1200 x 3 x 1.5 <br />Flight 123 HP pump usage $1620 x 3 x 1.5 <br />GD 83 jackleg $1125 x 3 x 1.5 <br />Outside loader $6000/mo. x 3 x 1.5 <br />Subtotal Other Equipment, not including overhead and profit <br />Overhead and Profit @ 13.07% <br />Subtotal <br />Add 5% DRMS administration required by statute <br />Other Equipment Component of Bulkhead Bond <br />Bond Amouut for One Required and Two Contineency Bulkheads <br />Labor $170,558.00 <br />Supplies, Equipment, and Engineering $238,050.00 <br />Other Equipment $122,639.00 <br />Total $531,247.00 Direct and Indirect Costs Inclusive <br />$13,500.00 <br />$5400.00 <br />$7290.00 <br />$5062.50 <br />$27,000.00 <br />$103,297.50 <br />13,500.98 <br />116,798.48 <br />5839.92 <br />$122,639.00 <br />c:\acs filesVvly Documents 4-19-061hru\whirlwind bulkhead costs.doc <br />