Laserfiche WebLink
Memo to Russ Means 7 November 14, 2007 <br />Whirlwind Mine Bulkhead Costs File No. M-2007-044 <br />Task and Cost Item Ouantit~ Extended Cost <br />Meals during pour $345 x 0.38 x 1.5 $196.b5 <br />Strip Forms, Move Equipment, and Grout Bulkhead <br />Terry Tunnel <br />Grout mixer and pump $250/wk. x 2 wks. <br />Packers $480 <br />Type V cement $112 <br />Decline Bulkheads (both) <br />Grout mixer and pump $2501wk. x 2 x 2 wks. x 1.5 $1500.00 <br />Packers $480 x 2 x 1.05 x 1.5 $1512.00 <br />Type V cement $112 x 2 x 1.05 x 1.5 $352.80 <br />Pack Rat <br />Grout mixer and pump $250/wk. x 2 wks. x 1.5 $750.00 <br />Packers $480 x 1.05 x 1.5 $756.00 <br />Type V cement $112 x 1.05 x 1.5 $176.40 <br />Miscellaneous Costs <br />Terry Tunnel <br />Engineering design $4538 <br />Engineering inspection $2077 <br />Materials testing $168 <br />Miscellaneous small hand tool usage $3000 <br />Miscellaneous materials (nails, bits, wire, etc.) $3000 <br />Diesel $1500 <br />Electricity $5000/mo. <br />Safety supplies $1000 <br />Intake screen, bypass pipe $200 <br />Decline Bulkheads (both) <br />Engineering design $4538 x 1.5 $6807.00 <br />Engineering inspection $2077 x 2 x 1.5 $6231.00 <br />Materials testing $168 x 2 x 0.21 x 1.5 $105.84 <br />Miscellaneous small hand tool usage $3000 x 2 x 1.07 x 1.5 $9630.00 <br />Miscellaneous materials (nails, bits, wire, etc.) $3000 x 2 x 1.07 x 1.5 $9630.00 <br />Diesel $1500 x 2 x 3 $9000.00 <br />Electricity $5000 x 2 x 1.5 $15000.00 <br />Safety supplies $1000 x 2 x 1.5 $3000.00 <br />Intake screen, bypass pipe $200 x 1.5 $300.00 <br />Pack Rat <br />Engineering design $4538 x 1.5 $6807.00 <br />Engineering inspection $2077 x 1.5 $3115.50 <br />Materials testing $168 x 0.38 x 1.5 $95.76 <br />Miscellaneous small hand tool usage $3000 x 1.07 x 1.5 $4815.00 <br />Miscellaneous materials (nails, bits, wire, etc.) $3000 x 1.07 x 1.5 $4815.00 <br />