Laserfiche WebLink
Permit Term Information - Rule 2.03.8 <br />1. The applicant needs to provide the anticipated or actual starting <br />date or termination date of each p ase of the underground mining <br />activities, and the anticipated number_ ofacres of surface lands to <br />• be affected, and the horizonta and vertical extent of ro osed <br />un er round mine war ings, for eac p ase o mining an over t e <br />total life of the permit. <br />RESPONSE: <br />Peerless Resources, Inc. plans to initiate underground mining activities <br />shortly after permit issuance. Mining should begin during the second <br />half of 1985. The horizontal extent of planned underground mining is <br />shown on the Mine Plan Map (Map II). As explained in Section 2.05.3, <br />Peerless Resources, Inc. plans to mine the "A" coal Seam. This seam is <br />approximately five (5) to six (6) feet in thickness. Mining in the "A" <br />Seam within the proposed permit area is planned to continue for <br />approximately ll years or until about 1995. The anticipated number of <br />acres with regard to the underground workings is set forth in Table 2A, <br />Area of Underground Workings. <br />• <br />L J <br />2.03-~~,~ MAR Q4 19~ <br />