Laserfiche WebLink
Appendix D <br />Cost Tables <br />Earthwork Cost -Summary of Costs D-1 <br />Earthwork Cost -Dozers D-3 <br />Earthwork Cost -Cast Blasting D-5 <br />Earthwork Cost -Road Maintenance Equipment D-7 <br />Topsoil Distribution Costs -- Summary of Costs D-8 <br />Topsoil Distribution Costs -- Scrapers D-10 <br />Topsoil Distribution Costs --Trucks and Loaders D-11 <br />Topsoil Distribution Costs -- Road Maintenance Equipment D-13 <br />Topsoil Grading Costs -- Summary of Costs D-15 <br />Topsoil Grading Costs -- Motorgrader D-16 <br />Facilitiies Removal Costs D-18 <br />Facilitiies Removal Costs Summary D-23 <br />Facilities Removal Costs --Dozer Grading and Ripping D-24 <br />Facilities Removal Costs --Asphalt Removal D-25 <br />Revegetation Costs D-26 <br />Supervision Costs D-28 <br />Support Equipment Costs D-29 <br />Mobilization and Demobilization Costs D-30 <br />Other Costs -- CMLRD Add-On D-31 <br />Stockpile Waste Removal Costs -- Trucks and Loaders D-32 <br />Borehole Sealing Reclamation Costs -Summary Sheet D-34 <br />Revision: TR-56 <br />BOND_CALC_TR 56_033104.x1s Date: 3/31/04 <br />