Laserfiche WebLink
<br />w <br />_} <br />10. Primary.future ~ Cropland(CR) _ Pastureland(PL) General Agriculture(GA> <br />(Post-mining) _ Rangeland(RL) Forestry(FR) ~ Nildlife Habitat(NL> <br />land use Resldential(RS>xx Recreatton(RC) Industrial/Commercial(IC> <br />(check one>: _ Developed Nater Resources(NR) _ Solid Naste Dtsposal(ND> <br />11. Primary ro esent XX Cropland(CR) _ Pastureland(PL) _ General Agriculture(GA> <br />land use _ Rangeland(RL) _ Forestry(FR) _ ilildllfe Habitat(NU <br />(check one): Residential<RS) Recreation(RC) _ Industrial/Commercial(IC) <br />_ Developed Water Resources(NR) <br />12. Method of Mining: _ Quarry (QR) _ Solution (50)' <br />12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel). <br />Excavation bV floating rirorlgo Cruchin9/nrocPCCinA nn-cite. <br />.. <br />13. On Site Processing: Soiution (SO> Chemical <CH) Thermal (TH) <br />_ Heap Leach (HL) _ Vat Leach (VL) <br />14. Application Fee: <br />The application fee for Quarry mining is 12,325. <br />The application fee for Solution mining or any Chemical or Thermal Processing <br />is 53,100. <br />If none of these methods or processes are to be included in the operation then the <br />application fee is 51,875. <br />The application fee for conversion to a 112 permit is 51,500. <br />112 Amendment application fee is 51.550. <br />An applicant rill not be issued a reclamation permit until notified by the Division that <br />this application and the required. performance. and financial warranties Aave been <br />approved. Alternatively; an.automatlc,approval rill occur vAere:xhe Divliton fails to <br />notify the applicant/operator that the application has been denied. The 'final agency <br />action must be made rtthin 120 calendar days from the date the application vas <br />submitted. However, the performance and financial rarranties must be approved by the <br />Division or Board before a permit rill be issued even if you receive an automatic <br />approval. HO HINING OPERATIONS SHALL BEGIN UNTIL A PERMIT I$ ISSUED (Rule 7.2(2>). <br />It shall be a provision of this permit that the operations rill be conducted to <br />accordance rlth the terms and cohdittons listed in your application, as cell as vith the <br />provisions of the Act and the Mineral. Rules and Regulations 1n effect at the time the <br />permit 1s issued. <br />