Laserfiche WebLink
TABLE OF DISTURBANCE <br />The acreages presented in this table are for a point in time when <br />the disturbance is maximized. At this point the dredge will be at <br />the southern end of a mining phase so a portion of a permanent lake <br />and shoreline is present along with backfilled land from the slurry <br />pipeline. At the slowdown of the annual mining season (November), <br />20 acres will have been mined that year. <br />Major <br />1. 5.0 acres New lake water surface <br />2. 15.0 Backfilled land by the slurry pipeline <br />3. 0.2 Shoreline on permanent lake, 966 if <br />4. 0.1 Topsoil stockpile, 36,000 cy <br />5. 0.4 Overburden stockpile, 155,000 cy <br />6. 0.5 Previous stockpile area <br />--------------- <br />21.2 acres <br />Moderate <br />7. 15.0 acres <br />8. O.Z. <br />9. 0.8 <br />10. 4.8 <br />11. 40.0 <br />12. 0.7 <br />61.5 acres <br />---------------------------------------- <br />Subtotal ' <br />Overburden and topsoil distributed on <br />backfilled land <br />Shoreline graded with topsoil and overburden <br />Railroad spur, 2060 if x 15 if <br />Mine access roads, 2 miles x 20 if <br />Plant processing area <br />Field conveyor, 1 mile x 6 if <br />Subtotal <br />Minor <br />13. 15.0 acres Recently seeded backfilled land <br />14. 0.2 Recently seeded shoreline <br />15. <br />~ 15.0 One year grass growth, backfilled land <br />16. 0.2 One year grass growth, shoreline <br />17. 0.1 Planted wetland <br />i 30.5 acres Subtotal <br />113.2 acres TOTAL <br />93171dstb.tbl <br />i_G <br />