Laserfiche WebLink
KERR COAL COMPANY <br />KERR MINE <br />QUARTERLY SEDIMENTATION POND IN: <br />Pond B <br />Date 12-20-03 <br />REPORT <br />1. Water Level (above or below dewatering orifice) Above_ Below X <br />2. Sediment Level (below dewatering orifice (designed sediment level)] <br />3. Sediment Removal Required Yes <br />9. Outflow (depth of flow in weir) <br />5. Outflow <br />* Ft <br />* Ft <br />No <br />0 Ft <br />0 CFS <br /> PROBLEM <br />FEATVRE3 <br />YE3 <br />NO COMMENTS <br />EROSION: <br />Rills & Gullies on Embankments <br />X <br />Wave Erosion X <br />Spillway Erosion X <br />Burrows X <br />Others X <br /> <br />STRUCTURAL: <br />Differential Settling <br />X <br />Cracks or Slides X <br />Seepage X <br />Other X <br /> <br />STRUCTURES: <br />Principal Spillway <br />Clogged Orifice <br /> <br />X <br />Clogged or Damaged Culvert X <br />Weir X <br />Emergency Spillway <br />Erosion <br />X <br />Riprap X <br /> <br />MAINTENANCE REQUIRED: None. <br />MAINTENANCE PERFORMED: None. <br />ADDITIONAL COMMENTS; * Snow S ice covered. <br />dilU hfltl : . <br />NAME OF INSPECTO~ \ <br />O <br />\`~~~°4Ppv rr~ <br />J ~~ S'E °' <br />O o°~P ~ <br />U eS0 <br />CT ' „ •j' <br />~^ <br />j ( O °O••w•e <br />/°~O'U~S~~NA <br />