Laserfiche WebLink
~~ s <br />Mr. Dan .lackson <br />Tune 24, ] 999 <br />Page 3 <br /> <br />7. PP. 18-20 Armular Fluid. The "take" of nitrogen should be monitored, because gas <br />leakage may well be the initial fluid loss due to sill pillaz caving. <br />8. P. 22, Par. 1 The requirement to "Cap" well 20-1 if 50' of water level rise occurs is not <br />conducive to good monitoring practice. Water level measurements will be <br />invaluable in determining the effectiveness of any corrective action. <br />Thank you for this opportunity to comment. Ifyou have any questions on the above, please <br />do not hesitate to contact me. <br />Yours truly, <br />GAM/an <br />a,,~~ <br />Glen A. Miller <br />Encl. <br />