Laserfiche WebLink
PERIODIC INSPECTION PORN <br />Water, Sediment, or Blurry Impoundments <br />INSPECTOR'S NAME: Mi ha t Al av; a DATE: 03/23/99 <br />NPDES I.D. NO.: co-0000221 D.P. 003 <br />FACILITY CONFIGURATION: Dikad Po d DATE LAST INSPECTION: 12/10/98 <br />SITE NAME: Northwest rmnenndment x`003 LOCATION: S£~ eW), aec_ 27 T6N RR7W <br />MINE NAME: R Weep a rI Mi nP ~c nand oal 01 LOCATION: 7.1 mi_ SR of Ha~den,_~ <br />MINE I.D. NO.: eMr.an P rmit Ne. -B0-OOS OWNER'S REP.: Hrad Hrovn, C-en Mgr <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br />Foundation preparation (removal of vegetation, stumps, topsoil: _ <br />Lift thickness: <br />Compaction according to approved plan: <br />Burning (specify extent and location): <br />Angle of elope: 2:1 upstream, 3:1 downstream <br />*Seepage (specify location, color, and approximate volume) <br />From underdrain pipes: <br />At isolated points on embankment elopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />Cracks or ecarpe on crest: <br />Cracks or ecarpe on elope: <br />ee No <br />1Z in. <br />No <br />Yes No <br />Total = 5.1 <br />Sloughing or bulging on elope: <br />*Major erosion problems: <br />surface movements in valley bottom or on hillside: <br />*Sroeion of toe: <br />*Water impounded against toe: <br />Existing embankment freeboard: <br />Yee No <br />Yee <br />Yee o <br />Yee o <br />Yee N <br />xes o <br />Yee <br />Yee <br />Yee N <br />Yee <br />Yes ...ppP---,,, <br />Yee <br />Yee o <br />q"g feet <br />N/A <br />N/A <br />N/A <br />N/A <br />N A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />15. Increase Decrease in water level: No ch ange feet <br />16. Cracks, bulging, or erosion on upstream face: Yee No N/A <br />17. Visible sumps or sinkholes in slurry surface: Yee No <br />18. *Clogging <br /> Spillway channels and pipes: Yee ~ N A <br /> Decant system: Yee N <br /> Diversion ditches: Yee ~ N/A <br />19. *Cracking or crushing of pipes <br /> Spillway pipes: Yee ® N A <br /> Decant system: Yee No <br />20. Trash racks clear and in place: ee No N/A <br />*Major adverse changes in these items could cause instability and should be reported to the <br />Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions noted <br />in these items should normally be described (extent, location, volume, etc.) in the apace on <br />the back of this sheet. <br />