Laserfiche WebLink
EXHIBIT "L" <br />RECLAMATION COST <br />1 CUT BANK SLOPES <br />2 REVEGETATE BANK SLOPES <br />3 FERTILIZER available N S P SEE ABOVE <br />4 N/A <br />5 SCRIFIYING SEE ITEM # 1 ABOVE <br />6 SEEDBED PREPERATION and PLANTING SEE ITEM 2 ABC <br />7 MULCHING HAY or STRAW SEE ITEM # 2 ABOVE <br />6 WEED CONTROL <br />9 M081LIZ4TlON 8 DEMOBILIZATION from WALSENBURG <br />10 JOB SUPERINTENDENT <br />TOTAL DIRECT COST <br />INDIRECT COST OVERHEAD and PROFIT <br />PUBLIC LIABILITY INSURANCE <br />CONTRACTOR PERFORMANCE BOND COST <br />CONTRACTOR PROFIT <br />QTY. UNIT COST UNIT <br />aoooo a1.us LCY <br />22 5661.55 ACRE <br /> soon ACRE <br /> sa.oa LCY <br /> 50.0o ACRE <br /> so.ao ACRE <br /> 5o.ao ACRE <br />7o sso.oo HOURS <br />1 sl,soo.oo LS <br />178 533.35 HOURS <br />1.55% <br />1.05% <br />10.00% <br />DMG PROJECT ADMINISTRATION EXPENSE <br />TOTAL PERFORMANCE BOND AMOUNT <br />9.25% <br />PROJECT NAME: SAND ARROYO PIT COST/ACRE <br />COST <br />544,960.00 <br />514.554.10 <br />Eo.oo <br />EO 00 <br />50.00 <br />50.00 <br />50.00 <br />5500.00 <br />57,500.00 <br />55,936.30 <br />567,470.40 <br />$1,045.79 <br />$708.44 <br />$6,747.04 <br />$6,241.01 <br />$az,2lz.ss <br />Sa,zzl.z7 <br />