Laserfiche WebLink
iii iiiiiiiiiiiiiii <br />QUARTERLY POND INSPECTION REPORT <br />PERATOR: HONEYWOOD COAL CO. QUARTER: FOURTH QUARTER 1992 <br />INE: HAMILTON MINE DATE OF INSPECTION: DECEMBER 17, 1992 <br />POND IDENTIFICATION A B <br />YPE OF POND SEDIMENT SEDIMENT <br />STATUS DURING INSPECTION: <br />PPROXIMATE WATER LEVEL 4" SNOW 4" SNOW <br />ED ($ total storage) 0$ 0$ <br />UTFLOW (cfs) 0 0 <br />FEATURES PROBLEM COMMENTS <br />ROSIONAL: YES NO <br /> <br />Rills & Gulleys X <br />Inadequate Vegetation X See below <br />Outlet Channel Erosion X <br />Burrows X <br />Other X <br />TRUCTURAL: <br />Differential Settling X <br />Cracks or Slides X <br />Seepage X <br />Other X <br />PPURTENANT STRUCTURES: <br />Defective Spillways X <br />Dewater Device Clogged X <br />Faulty Gates, Etc. X <br />Other X <br />DDITIONAL COMMENTS: Ponds were built during the first quarter of 1992. <br />eeding of the pond embankment will occur during the spring of 1993. <br />INTENANCE REQUIRED: None <br />AME OF INSPECTOR:.Kirt Jewk¢ s <br /> James E. Stover <br /> Colorado P.E. 19230 <br />