Laserfiche WebLink
<br />COAL_ C:ONIPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: LARR~~etr~~- Date: 7-1 y- 9V <br />Pond Number: G Date Last Inspection: 9-29- 9 0 <br />Site Name: G!1 /7A ~'/ ~ Quarter: j/r~Q/ 90 <br />1. Design Depth Measured From Spillway Invert ~ ~ <br />2. Design Maximum Sediment Level Measured From Spillway Invert 2.2 7 <br />3. Sediment Level/Pond Bottom Measured from Spillway Invert 7.0 <br />4. Water Level Measured From Spillway Invert iy,,~c <br />5. Discharge Through Spillway Since Last Inspection _ Yes ~ No <br />6. Rills and Gullies Yes X No <br />7. Vegetation Adequate X Yes _ No <br />8. Outlet Channel Erosion Yes X No <br />9. Animal Burrows . ~. X Yes No <br />10. Cracks Yes X No <br />11. Seepage `Yes X No <br />12. Spillway Clogged _ Yes X No <br />13. Valves Operational X Yes _ No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED: ~p~,~ ~// gL ~„,par¢ 6tiR/ka. /~EI2 rP~~/cey <br />~ ' <br />--- - - -- -- --------' --' gPI[[WAY SNVERr <br />~';s-~.- °~ had ~O W <br />3~ ~~ s o•Ohv R ~fJ <br />