Laserfiche WebLink
TruckfLoader Team Work cont'd Task # : 004 sheet 2 of 2 <br />a Loading Tool Cvele Time : ~ Number of loading tool~passes required to fill truck : ~4 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : AVERAGE <br />-selected value within basic rating : AVERAGE <br />Track loaders -material descr.:NA <br />- cyGe time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, and dump) : NA minutes <br />Cyde Time Factors Loading Condition Description Factor (min.) Source <br />Material: NA NA NA <br />Stockpile : A NA NA <br />Truck ownership : NA NA NA <br />Operation . NA NA NA <br />Dumptarget: NA NA NA <br />Net Cycle time adjustment : NA minutes <br />Adjusted basic cycle time : 0.321 minutes <br />Net load time per truck (bulk of first loader pass completed dudng truck exchange) : 1.063 minutes <br />Truck Cvcle Time <br />Truck exchange time: 0.50 minutes........ Adjusted for site altitude : 0.50 minutes <br />Truck Toad time: 1.063 minutes........ Adjusted for site altitude : 1.06 minutes <br />Truck maneuver and dump time: 0.80 minutes........ Adjusted for site altitude : 0.80 minutes <br />Truck travel (haul & return) time: <br />Road condition description :Finn, smooth, rolling, dirt or light surfaced, watered, maintained <br />Haul route <br />• <br />Road <br />seg. # Haul distance <br />feet Grade <br />res. (%a) Rolling <br />res. (%a) Total <br />resistance (%) Speed <br />feeUminute Travel time' <br />(minutes) <br />1 5,000 10.00 3.00 13.00 675 7.64 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul time ": 7.64 minutes <br />Return time "' 1.67 minutes <br />Total truck cycle time : 11.67 minutes <br />• <br />Loading tool unit production : 302.30 LCY/hour...... Adjusted for job efficiency : 250.91 LCY/hour <br />Truck unit production : 40.49 LCY/hour...... Adjusted for job efficiency : 33.60 LCY/hour <br />Optimal no. WcksAoading tool : 7 trucks........... Selected no. Wcks/loader : 4 Wcks <br /> Adjusted hourly Wck team production : 134.41 LCY/hr <br /> Adjusted houdy single truck/loader team production : 134.41 LCY/hr <br /> Adjusted houny multiple truclNOader team production : 134.41 LCYlhr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 1.32 Hours <br />Unit cost : 52.483 /LCY Total job cost : 5439 <br />Table~3.9-6 ~ ~ -8- ~ 08/03 <br />' M1rst and last segments atlNStetl ra aetelero4oNEeWenCOn <br />" tlme snows intludea al6tuoe aoiusomanl <br />