Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />May 2007 Monthly Report <br />Page 3 <br />Table 2 -May 2007 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piewmeter Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P12 5/31/07 D 41.71 0.00 <br />P13 5/31/07 40.99 41.34 0.35 <br />P14 5/31/07 D 41.24 0.00 <br />P15 5/31/07 D 41.10 0.00 <br />Table 3 below provides the calendar year 2007 sludge management for the San Luis site. <br />Table 3 -Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sludge Management <br />October 2006 242 tons Sludge transferced from Pond #3 to drying <br /> ad. <br />March 2007 242 tons Sludge transferced from drying pad to tailings <br /> im oundment. <br />May 2007 Sludge transferced from Pond #3 to drying <br /> ad. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0798 or Mr.1~iH-Lyle (303) 324-2630 or (970) 325-4482. <br />]111io F. Iv~drid <br />Environmental Coordinator III <br />Cc: Bill Lyle <br />File <br />