Laserfiche WebLink
<br />QUARTERLY POND INSPECTION REPORT <br />OPERATOR: TERROR CREEK COMPANY QUARTER: THIRD QUARTER 1996 <br />MINE: TERROR CREEK LOADOUT DATE OF INSPECTION: SEPTEMBER 26, 1996 <br />POND IDENTIFICATION #1 #2 <br />TYPE OF POND SEDIMENT DUGOUT <br />STATUS DURING INSPECTION: <br />APPROXIMATE WATER LEVEL SEE NOTE DRY <br />SED ($ total storage) ~ 0$ N/A <br />OUTFLOW (Cfs) NONE NONE <br />FEATURES PROBLEbI PROBLEM COMMENTS <br />EROSIONAL: YES NO YES NO <br /> <br />Rills & Gulleys X X <br />Inadequate Vegetation X X <br />Outlet Channel Erosion X ~ X <br />Burrows X X <br />Other X X <br />STRUCTURAL: <br />Differential Settling X X <br />Cracks or Slides X X <br />Seepage X X <br />Other X X <br />APPURTENANT STRUCTURES: <br />Defective Spillways X X <br />Dewater Device Clogged X X <br />Faulty Gztes, Etc. <br />Other X X <br />ADDITIONAL COMMENTS: The water in the pond is 18" below the invert of the <br />prim~ry s illway. The design sediment level in the pone} is 18" belopw <br />th <br />~ <br />f th <br />i <br />ll <br />Th <br />f <br />th <br />d <br />t l <br />l <br />e lnver <br />o <br />e pr <br />mary spi <br />way. ere <br />or e, <br />e se <br />imen <br />eve <br />is <br />0$. <br />The dugout pond was dry. <br />The SWMP control deveices were inspected and found to be in good order. <br />Reference Drawings: Sediment Pond - Map 7; SWMP Co~tr0a~~'w- <br />Map 14 <br />t <br />d <br />i <br />i <br />` <br />Dugou <br />Pon <br />- E t 9, <br />xh <br />b l <br />Pag~~ <br />~~~,~,~ ~J <br />f~~ <br />MAINTENANCE REQUIRED: None . <br />:o~o~F,S f ~lo•9F•~ <br />NAME OF INSPECTOR: Jim Stover ~U'~ - - L ---- <br />~ <br /> ~* ~ 1 <br />p' <br />~ <br />92 <br /> ~ <br />1 <br />30 G/ 27 96 <br /> <br />RECEIVED SEP 3 0 1996 '~•f~/ONAL ;~:'~• <br />•.... <br />