Laserfiche WebLink
;.. <br />~(~iVC~ <br />QUARTERLY POND INSPECTION REPORT <br />OPERATOR: TERROR CREEK COMPANY QUARTER: FOURTH QUARTER 1993 <br />MINE: TERROR CREEK LOADOUT DATE OF INSPECTION: DECEMBER 20, 1993 <br />POND IDENTIFICATION #1 #2 <br />TYPE OF POND SEDIMENT DUGOUT <br />STATUS DURING INSPECTION: <br />APPROXIMATE WATER LEVEL 3" SNOW DRY <br />SED (~ total storage) 0$ N/A <br />OUTFLOW (cfs) NONE NONE <br />FEATURES PROBLEM COMMENTS <br />EROSIONAL: YES NO <br /> <br />Rills & Gulleys X <br />Inadequate Vegetation X <br />Outlet Channel Erosion X <br />Burrows X <br />Other X <br />STRUCTURAL: <br />Differential Settling X <br />Cracks or Slides X <br />Seepage X <br />Other X <br />APPURTENANT STRUCTURES: <br />Defective Spillways X <br />Dewater Device Clogged X <br />Faulty Gates, Etc. X <br />other X <br />ADDITIONAL COMMENTS: The snow in the pond is 18" - 24" below the invert <br />of the rimaryy s illway. Therefore the snow/water level is at the design <br />~ th <br />t~ <br />l <br />l <br />f th <br />d <br />eve <br />om o <br />o <br />e bo <br />e pon <br />. <br />The dugout pond was dry. The silt fence located at the outlet of the <br />dugout pond was in good condition. <br />The SWMP control devices were inspected. No maintence is required on the <br />SWMP control devices. <br />Reference Drawings: Sediment Pond - Map 7; SWMP Controls - Map 14 <br />Dugout Pond - Exhibit 9, Page 11 <br />MAINTENANCE REQUIRED: NONE <br /> <br />NAME OF INSPECTOR: Kirt ewkes --- <br />J. E. Stover <br />~ P.E. 19230 <br />