Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />OPERATOR: TERROR CREEK COMPANY QUARTER: THIRD QUARTER 1994 <br />MINE: TERROR CREEK LOADOUT DATE OF INSPECTION: SEPTEMBER 16, 1994 <br />POND IDENTIFICATION #1 #2 <br />TYPE OF POND SEDIMENT DUGOUT <br />STATUS DURING INSPECTION; <br />APPROXIMATE WATER LEVEL See Note DRY <br />SED (~ total storage) 0% N/A <br />OUTFLOW (cfs) NONE NONE <br />FEATURES PROBLEM COMMENTS <br />EROSIONAL: YES NO <br /> <br />Rills & Gulleys X <br />Inadequate Vegetation X 1~/F ~1 <br />A B <br />Outlet Channel Erosion X ~~~~1 " ' <br />Burrows x <br /> <br />Other <br />X ~ 4 <br />Q(i'~ <br />STRUCTURAL: DIV :>~'-~~'+ <br />MINERAt.~ ~ uEG~-r^ , <br />Differential Settling X <br />Cracks or Slides X <br />Seepage X <br />other X <br />APPURTENANT STRUCTURES: <br />Defective Spillways X <br />Dewater Device clogged X <br />Faulty Gates, Etc. X <br />other X <br />ADDITIONAL COMMENTS: The water in the pond is 24" below the invert of the <br />primary spillway. Therefore the w <br />h <br />d ater level is below the design level <br />of the bottom of t <br />e pon <br />. <br />The dugout pond was dry. The silt fence located at the outlet of the <br />dugout pond was in good condition. <br />The SWMP control devices were insp ected and found to be in good condition. <br />Reference Drawings: Sediment Pond - Map 7; SWMP Controls - Map 14 <br />Dugout Pond - Exhibit 9, Page 11 <br />MAINTENANCE REQUIRED: NONE <br />NAME OF INSPECTOR: KIRTES ---------------- <br />~ J. E. Stover <br /> P.E. 19230 <br />