Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />OPERATOR: TERROR CREEK COMPANY QUARTER: FIRST QUARTER 1995 <br />MINE: TERROR CREEK LOADOUT DATE OF INSPECTION: MARCH 8, 1995 <br />POND IDENTIFICATION #1 #2 <br />TYPE OF POND SEDIMENT DUGOUT <br />STATUS DURING INSPECTION: <br />APPROXIMATE WATER LEVEL 18" 1" Snow <br />SED (% total storage) 0% N/A <br />OUTFLOW (cfs) NONE NONE <br />FEATURES PROBLEM COZwII 4ENT 5 <br />EROSIONAL: YES NO <br /> <br />Rills & Gulleys X <br />Inadequate Vegetation X <br />Outlet Channel Erosion X ~?~~~~,;~L_ <br />Burrows X <br />~ <br />other x ~ 0 199, <br /> <br />STRUCTURAL: DiViSip <br /> ~ Ot Miri~rdf.5 ,i `: <br /> <br />Differential Settling <br />X ;I,JJ <br />; <br />Cracks or Slides X <br />Seepage X <br />Other X <br />APPURTENANT STRUCTURES: <br />Defective Spillways X <br />Dewater Device Clogged X <br />Fa.:lty Ca*_es, Etc. X <br />Other X <br />ADDITIONAL COMMENTS: The water in the pond is at the invert of the primary <br />spillway. Therefore, the sediment level i n the pond cannot be determined. <br />Dewatering of the pond may be required if the water level increases. <br />The dugout pond was covered with about 1" of snow. <br />The SWMP control devices were inspected. The filter cloth on SAE-1 and <br />the silt fence located at the outlet of th e dugout pond needs to be <br />replaced. <br />Reference Drawings: Sediment Pond - Map 7; SWMP Controls - Map 14 <br />Dugout Pond - Exhibit 9, Page 11 <br />MAINTENANCE REQUIRED: Silt fence repair as noted. f s 9_ys <br />NAME OF INSPECTOR: Jim Stover ------ <br /> J. E. Stover i <br /> P.E. 19230 <br />