My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53974
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:15 PM
Creation date
11/20/2007 3:59:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059A
IBM Index Class Name
Permit File
Doc Date
10/21/2003
Section_Exhibit Name
Exhibit 10 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILRATION / DEMOBILRATION <br />Agency or orgenlzatlan name : Cobredo Division Ol Minerals And Geology <br />Teak*: 019 Slata:Cobrado PermPlpb N:C$3-059 <br />Date: 03%42003 Cawy:Oetta Abbreviatlon:nane <br />User: JRS Site :Tenor Creek LCetloul Filename: C059-019 <br />Permit or Omer lob ectbn : PemtR Renews/ 01 <br />Task aescdption : Mob7/!ze/Demob7l/ze Equipment foi Yearly Slte Maintenance <br />EQUIPMENT TRANSPORT mG COST Shill baab: f per day <br />Cost daW aaurce : CRG Oeta <br />NON•ROADABLE EOUIPMENf <br />Machine <br />Desorlptbn WelghVunil <br />ons Ownership <br />CosMr/uM MeM Rip <br />Cosuhr/uNl Fleet Size <br />o. units Haul Trip <br />CaaNU/fleet Retum Try <br />CoaMrAlaet DOT Ixmtit <br />CostMeat <br />Cat D3G LGP • 9P 8.69 $9.I2 519.90 10 388318 5799.00 10.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtatala: 3893.28 f799.00 f0.00 <br />cOUIPMENT HAUL DISTANCE antl TIM E <br /> Nearest malor airy or town within proleet Brea raglan : OeBa <br />Transoortalinn Cvela Time: Nw~ Total ane~way travel distance: 30.0 miles <br /> Roadable Roadable Avenge travel speed: 45.0 mph <br /> E~ulpment E ui0ment <br />Haul time (hours). 0.67 0.67 Total non-roadable mcb/demob cost': 3/1,189.21 <br />Relum Cana (hours). 0.67 0.67 'two mum alW wlmnm dp <br />Loading time (hours) = 2.50 NA Total roadable mob/demob cost ^ : 50.00 <br />Unloading terse (hours) 250 NA ~on•murM aP.mhaul d9 <br />Subtotals = 8.33 1.33 <br />JOB TIME AND COST Totet job lane: 12.87 hours <br /> Total job cast: $11,189 <br />
The URL can be used to link to this page
Your browser does not support the video tag.