My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23667
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:05 PM
Creation date
11/20/2007 3:59:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Hydrology
Doc Date
2/3/2000
Doc Name
4TH QTR 1999 INSPECTION
From
NATIONAL KING COAL
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NATIONAL KING COAL, LLC <br />III IIIIIIIIIIIII iil- <br />sss <br />DUNANDO OFFICE: <br />1315 Mein Avenue. Suite 311 MINE LOCATION. <br />Poet OlIles Bo: 2805 1121 County Roetl 120 <br />Durenpo, Colorado 81302 Nenperue, Colorado 8328 <br />~~ <br />Telephone: Telephone. <br />(B70) 258.2118 (B70) 385-1528 <br />Fex: Fez: <br />(870) 258.1516 (970) 385-4838 <br />{-t~CLIV~! ~ <br />February 1, 2000 <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street <br />Room 215 <br />Denver, Colorado 80203-2273 <br />Attn: Harry Ranney, Reclamation Specialist <br />Re: Don May Quarterly Inspection <br />Fourth Quarter 1999 <br />Dear Mr. Ranney, <br />FED 0~ 2000 ~~=~ <br />Division olMinerals & Gcob~,rj~ ~ ~l :. ZQQQ <br />'lieise-~~~,~ ~ ~ 'heolo(Jy <br />Please find enclosed a copy of Don May's Quarterly Inspection report for the fouth quarter <br />of 1999. <br />Melcher Machine Works of Durango has been contracted to do much of the <br />trackhoe/bulldozer type work as soon as weather permits. This includes all of the waste <br />pile ditches, cleaning of the ponds, locating the existing underdrain on the waste pile, etc. <br />We anticipate an approximate start date of April 1, 2000. <br />The inlet elevation of the pipe connecting the ponds has been checked and appears to <br />conform to design specs. <br />Sincerely, <br />/~_ <br />Tom Bird <br />National King Coal, LLC <br />cc: Don May, P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.