Laserfiche WebLink
<br />EXHIBIT "B" <br />MINING PLAN <br />1. Stripping and clearing of this area will be minimal due to <br />the open,barren terrain. <br />2. The material will be removed from existing hillside by means <br />of surface type operations. <br />3. These extracted materials will be screened, and possibly crushed <br />and stockpiled on adjacent areas. <br />4. All oversize material that cannot be used will be placed in the <br />excavated areas and covered with thie finer rejected materials and <br />blended in with the surrounding terrain. <br />5. The eouioment used in excavation and prncess~nn the raw ma.±erie.l <br />will be at the discretion of the operator. <br />