Laserfiche WebLink
<br />MOUNTAIN COAL COMPANY <br />WEST ELK MINE <br />1996 <br />ANNUAL CERTIFICATION OF <br />SED111~IENTATION POND MB-1 <br />This annual certification is prepared in compliance with Rule 4.05.9(10) <br />and 4.05.6(13) of the Regulations of the Colorado Mined Land Reclamation Board <br />for Coal Mining. <br />Phil Schmidt, the certifying engineer, has been working in the engineering <br />field for more than 15 years and has experience in the construction and inspection <br />of fills, dams, and embanlanents. He is a registered Professional Engineer in the <br />State of Colorado. <br />The specifications and as-built drawings for MB-1 are presented in <br />Exhibit 66 of the Mining and Reclamation Plan, as revised per Minor Revision No. <br />175 (November 1995). <br />The pond and embanlanent was visually inspected for erosion and structural <br />conditions and no problems were observed. <br />Phil Schmidt <br />P.E. No. 22845 <br />pp0 Rf~~ <br />FP <br />~, <br />s <br />6 <br />~ <br />o~ <br />~ ~. •''SCMgj'• ~ <br />v <br />, <br />845 <br />~ <br />rn. ~i <br />Ie~ ~~SS~Ch Al ENG? <br /> <br />