Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br /> QUARTERLY POND INSPECTION REPORT <br />Operator: Hone od Coal Com an Quarter. Third 1999 <br />Mine: Hamilton Mine - C-91-078 Inspection Date: Jul 16, 1999 <br />Pond Identification A B <br />ype of Pond Dam Dam <br />talus During Inspection: <br />pproximate Water Levei D D <br />Sediment (% total storage) 0% 0% <br />OuMow (cfs) 0 0 <br />Features Problem Problem <br /> YesMo YesMo <br />Erosional <br />Rills & Gulleys No No <br />Inadequate Vegetation No No <br />Outlet Channel Erosion No No <br />Burrows No No <br />Other No No <br />tructural <br />Differential Settling No No <br />Cracks or Slides No No <br />Seepage No No <br />Other No No <br />ppurtenant Structures <br />Defective Spillvrays No No <br />Dewatering Devices Clogged No No <br />Faulty Gates, Etc. No No <br />Other No No <br />dditlonal Comments None <br />Maintenance Required: None <br />WMP Controls: The outslopes of the two sediment ponds were ins Ys were noted. <br />~ <br /> ft <br />! <br />~ ... <br />~ <br /> i <br />• <br />, <br />i <br />E .Sr,~. Nf ~ <br />= <br />~: ~F <br /> , <br />.o <br />i ~'; <br />~' a <br /> Q <br />p:~rs <br />• <br /> 1q~30 <br />: <br />Name of Inspector: Jim Stover <br />`~ <br /> ,T.~. Stover : ~. • <br /> ~ <br />~.~6~r F! ~}1~l30 Date <br />~ <br /> ~~ <br />A~s,• <br />