Laserfiche WebLink
<br />ANTICIPATED IMPACT <br />The filling rate in both mines is expected to slow as the water level raises <br />' above inflows measured in previous mine inflow studies. These decreased <br />inflows are expected to result in very minor increases in flow in North <br />Thompson Creek. As the No. 1 Mine fills above the North Thompson Creek minor <br />seepage is projected from the mine into the creek. Even if total iron level <br />are high in the mine very little impact is expected on the creek. <br />With the major reclamation work done on the site during the past two years, <br />the potential for impact from exposed coal and waste has been reduced. There <br />is a minor potential for impact from dirt and rock newly exposed during the <br />reclamation work. This potential will decrease as minerals from the surface <br />' leach into the ground. <br />1 <br /> <br /> <br />Cl <br /> <br />1 <br /> <br /> <br />1 <br /> <br /> <br /> <br />1 <br />