Laserfiche WebLink
• III IIIIIIIIIIIIIIII • <br />999 <br />RIDER TO MINING PERMIT <br />Permit Date: November 12, 1987 <br />Permit No: M-86-015- <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />Stipulation No. O1 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, VALCO WILL SUBMIT NEW EXHIBITS CAND <br />F MAPS WHICH INCORPORATE THE 3.71 ACRES ADDED TO THE PERMIT AREA AS <br />A RESULT OF THE DIVISION ADEQUACY REVIEW. <br />Stipulation No. 02 <br />WITHIN 6 MONTHS OF PERMIT ISSUANCE, VALCO WILL SUBMIT FOR DIVISION <br />STAFF APPROVAL A DETAILED PLAN FOR THE DIVERSION OF THE <br />DRAINAGEWAYBISECTING THE PERMIT AREA. THIS PLAN MUST INCORPORATE <br />APPROPRIATE HYDROLOGIC CALCULATIONS OF ESTIMATED FLOOD AND ENGINEERING <br />DESIGN OF ALL DIVERSION STRUCTURES (AS CERTIFIEC BY A <br />PROFESSIONAL ENGINEER). <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />FRED R. BANTA <br />Director <br />5627G <br />