Laserfiche WebLink
Western Fuels-Utah, Inc. Deserado Mine <br />Quarterly Sediment Pond P.E. Inspection Report <br />Date of Inspection: 6/18/96 Inspector: Gordon Bell -- Environmental Engineer <br />Operational Status <br /> Type o Appror S ent 20 Sam . <br /># Ponds Name H2O Level % Level % Outflow Yes No Comments <br />I Sed Pon s DP-I 95 12 D. X Decant o e lu ed an valved <br />2 RP-1 0 10 N.D. X <br />3 RP-2,3 50 10 N.D. X Sediment removed 10/95 <br />4 RP-4 30 5 N.D. X Filled & com acted cracks 6/96 <br />5 RP-5 l0 8 N.D. X Note: cracks observed 5130/96 <br />6 RR-1 0 5 N.D. X Burin IvII,R in lion. P.E. eval- <br />7 RR-2 0 5 N.D. X nation and recommendations for <br />8 RR-3 0 5 N.D. X air & future monitorin . <br />9 SS-1 60 10 N.D. X <br />10 SS-2 0 5 N.D. X <br />11 HSL-1 0 5 N.D. X <br />12 SDH-2U 20 5 ND X Shut off 2/96 due to mine sealin <br />13 SDH-2L 20 5 N.D. X Shut off 2/96 due to mine sealin <br />14 SDH-3/5 20 10 N.D. X Shut off 2/96 due to mine scalin <br />15 EP-I 0 5 N.D. X <br />16 Sunt s RRS-I 0 5 N.U. X <br />17 TS-1 0 5 N.D. X <br />18 TS-2 0 10 N.D. X <br />l9 EP-2 0 5 N.D. X <br />20 EP-3 0 2 N.D. X <br />21 EP-4 0 2 N.D. X <br />22 Proc Pond PP-1 50 40 N.D. X <br />23 PP-2 60 10 N.D. X <br />24 La o0o AL-I 90 Unknown N.D. X <br />Pond Descriptions <br /> <br /># Type o <br />Ponds <br />Name <br />Descri lion <br />I Sed Ponds DP-1 D-Portal <br />2 RP-I Refuse Area 1 <br />3 RP-2.3 Refuse Area 2/3 <br />4 RP-4 Refuse Area 4 <br />5 RP-5 Refine Area SA <br />6 RR- t Railroad Fill Slo a Pond 1 <br />7 RR-2 Railroad Fill Slo a Pond 2 <br />8 RR-3 Railroad Loo Pond <br />9 SS-1 Slot Stora a Buildin Access Road Pond <br />10 SS-2 Slot Stora a Buildin Emer eucV Coal Stora a Area Pond <br />I 1 HSL-1 Halandras Sanit Land Fill Pond <br />12 SDH-2U Dowv Hole Sum U er Influent Pond <br />l3 SDH-2L Down Hole Sum Lower Effluent Pond <br />14 SDH-3 Down Hole Sum Dischar e 2 <br />I S EP-1 East Portal <br />16 Sums RRS-1 Railroad Sum I <br />17 TS-1 TransferBuildin 1 <br />IS TS-2 TransferBuildin 2 <br />19 EP-2 East La down Pad <br />20 EP-3 West La •dowv Pad <br />21 EP-4 Turnaround Pad <br />22 Prw Pond PP-1 Plant Proccess Pond <br />23 PP-2 Pre Plant Process Pond <br />24 La oon AL-] Alluvial Raw Water La oon <br />