Laserfiche WebLink
PART I <br />Page No. 30 <br />Permit No. CO-0027154 <br />B. MONITORING REQUIREMENTS <br />1. Fregueucy and Sample Tvtx (continued) <br />a. Outfalls 001. 003, 005. 007, and 020 <br />Parameter Monitoring Frequency Sample Type <br />Flow, MGD Weekly Instantaneous <br />or Continuous <br />Total Suspended Solids, mg/2 Twice Monthly Grab <br />Settleable Solids, m2/E' - 001, 003, 005, 007 Monthly Grab <br />Oil and Grease, mg/P Weekly Visual <br />pH, s.u. (Minimum-Maximum) Weekly In-Situ <br />Electrical Conductivity, umho/cm Monthly Grab <br />Whole Effluent Toxicity, Chronic Lethality <br />Outfalls 001, 005, 007, 020 only Quarterly 3 Grabs/Test <br />Potentially Dissolved Cadmium, mg/Q Twice Montlily Grab <br />Potentially Dissolved Copper, mg/E Twice Monthly Grab <br />Total Recoverable Iron, mg/Q Twice Monthly Grab <br />Potentially Dissolved Manganese, mg/2 Monthly Grab <br />Potentially Dissolved Silver, mQ/e Twice Monthly Grab <br />b. Outfall 009 <br />Parameter Monitoring Frequency Sample Type <br />Flow, MGD Weekly Instantaneous <br /> or Continuous <br />Settleable Solids, m2/~ Monthly Grab <br />Oil and Grease, mg/P Weekly Visual <br />pH, s.u. (Minimum-Maximum) Weekly In-Sim <br />Electrical Conductivity, umho/cm Monthly Grab <br />Potentially Dissolved Cadmium, mg/E Monthly Grab <br />Potentially Dissolved Copper, mg/Q Monthly Grab <br />