Laserfiche WebLink
BTU EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PII.E I.D. NO. I2I1-CO-09-01370-01 (SURFACE WASTE PII.E} <br />PILE I.D. NO. 1211-CO-09-01370-02 (OLD NO. 9 EXCAVATION) <br />DATE/TIME:~ l 1~O S- <br />INSPECTOR SIGNATURE: ~ ~- <br />INSPECTOR TITLE: ~~ pOct~Sry Fn VI/anm~n74i~ ~/f~H~ <br />This inspection was conducted to comply with DMG Rule 4.09.1(11), <br />This inspection was conducted to evaluate: <br />_~.,A. Stability of fill (quarterly inspection) <br />_B. Critical construction periods: <br />1. Removal of al! organic materiaUtopsoil <br />,2. Placement of underdrainage system <br />,3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />NOTES: <br />Under the su vision of Michael W. Ludlow, Colorado P. . #24046 <br />file:I:\EN1EN V IRONMENTA LIEMP[RE\INSPREPI WASTEPILEFORM.DOC <br />_5. Revegetation <br />