Laserfiche WebLink
CIRCES Cost Estimating Software <br />BOREHOLE SEALING WORK <br />PROJECT IDENTIFICATION <br />SEALING ITEM I METHOD <br />DIAMETER <br />LENGTH <br />Task #: <br />6X2 <br />State Co <br />Permitijob # : JCC <br />Date: <br />05/152006 <br />County:R <br />Abbreviaiion: <br />User: <br />JRS <br />Site: Big Elk Mine <br />Fllename: -6X2 <br />Agency or organization name: <br />Colorado Division Of Minerals And Geology <br />6.25" <br />Permit or other job action <br />: Notice of Intent X- 2006 - 227 -01 <br />bag' <br />$8.25 <br />Task description Pluq and Seal 29 GeoteCh Holes <br />UNIT COSTS Equipment cost data source : Shift basis : 1 per day <br />BOREHOLE DESCRIPTION <br />SEALING ITEM I METHOD <br />DIAMETER <br />LENGTH <br />QUANTITY <br />UNIT, <br />UNIT COST <br />TOTAL COST <br />-Bottom Plug <br />PVC plug - 6 in. <br />6.25" <br />NA <br />29.00 <br />EA ' <br />$121.88 <br />$3,534.T2 <br />-Fill Holes with Cement <br />Portland cement grout <br />6.25" <br />3,800' <br />373.00 <br />bag' <br />$8.25 <br />$3,077.25 <br />- Borehole Markers <br />Borehole marker <br />NA <br />NA <br />29.00 <br />EA <br />$3.56 <br />$103.24 <br />-Drill Rig Time <br />GENERIC 3.0 in. - 1, 700 It. cap <br />NA <br />NA <br />87.00 <br />HR <br />$79.44 <br />$6,911.66 <br />-Water Truck Time <br />Water Tanker, 2,500 Gal. <br />NA <br />NA <br />87.00 <br />HR <br />$41.55 <br />$3,614.42 <br />i <br />i <br />JOB COST Total Cost: $17,241 <br />