Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />Operator: <br />Mine: Bear Coal Com an <br />Bear No. Three Mine Quarter: First <br />Inspection Date: March 23, 2003 <br />Pond Identification Mine Water <br />Type of Pond Sediment Dischar e <br />Status During Inspection: <br />Approximate Water Level 6' 1' <br />Sediment (%total storage) <br />Outflow (gpm) 25% <br />0 0% <br />20 <br />1 <br /> No <br />Features Proble Probl Division of Minerals 8 Geology <br /> <br /> Ye o Yes <br />Erosional <br /> <br />Rills & Gulleys No No <br /> <br />Inadequate Vegetation No No <br /> <br />Outlet Channel Erosion No No <br /> <br />Burrows No No <br /> <br />Other No No <br /> <br />Structural <br />Differential Settling No No <br />Cracks or Slides No Nc <br />Seepage No No <br />Other No No <br /> <br />Appurtenant Structures <br />Defective Spillways No No <br />Dewatering Devices Clogged No No <br />Faulty Gates, Etc. No No <br />Other No No <br />Additional Comments <br />Maintenance Required: <br />SWMP Controls: <br />Name of Inspector: William Bear Jr. <br />