My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23457
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:58 PM
Creation date
11/20/2007 3:50:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981011
IBM Index Class Name
Hydrology
Doc Date
11/21/1988
Doc Name
Water Quality Analysis Oct 1988
From
SUNLAND MINING CORP
To
MLRD
Permit Index Doc Type
CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />9unland Mining Corporation <br />c/o David R. Canning <br />Pyro Mining Company <br />P.O. Box 267 <br />Sturgis, KY 'i2499 <br />0~4-07-1988 <br />Mr. Peter V. O'Connor <br />Reclamation Specialist i ~!''!`°_ ~ •~ ~ ~ -- <br />Mined Land Reclamation Division ~~~- ~~; <br />- :.<s a: <br />`t23 Centennial Bldg <br />1313 Sherman Street ~1~'~ ~ ! 198 <br />Denver, CO 80203-2272 _ <br />lfO=C%.'-~PhHi'i0i~! ilil~('~I::~1r <br />Response to Notice of Violation C-BB-011 <br />9unland Mining Corp Apex No.2 C-81-011 <br />Oear Mr. O'Connor: <br />First period 1988 monitoring of Tro <br />Alluvial well was performed on 03-22-1988. <br />follows: <br />Trout Creek: <br />pH 6.2 Electroconductivity <br />Salinity 0.0 Temperature <br />Flow [Unable to determine: creek <br />Alluvial Well: <br />pH 5.7 <br />Salinity 0.0 <br />Elevation -6.75 Et <br />~t Creek and the <br />The results are as <br />100 micro-mho <br />2.9 C <br />iced over] <br />Electroconductivity 100 micro-mho <br />Temperature 6 C <br />The Mine Inflow study was conducted and the Apex No.2 <br />Mine sump was sampled on 02-20-88. NOTE: Ihis was prior to your <br />notice of violation. The sump sample was shipped to Grand <br />Junction Laboratories ^n 2-25-BB. The Mine Inflow Study data <br />were plotted on 03-2't-BB. <br />The inflow study map and the sump water analysis are <br />enclosed. <br />The first quarterly sedim nt pond inspection was <br />performed by Mr. Fred Kuchta on 1-BB, and the results were <br />reported to me by phone on the same day. The inspection report <br />is attached. <br />W~v~u-~ 03-31~£t8 N~ X5'31-SS <br />CA r~ v c~c~„a+M.v w I ~,r,ni~.~e oN <br /> <br />Your y, <br />I ~~ ~ ~~~ <br />David R. Canning <br />Vice-president <br />
The URL can be used to link to this page
Your browser does not support the video tag.