Laserfiche WebLink
~ • • <br />Sunland Mining Corporation <br />c/o David R. Canning <br />Pyro Mining Company <br />P.D. Box 267 <br />Sturgis, KY '32't59 ~~~~~~~~ <br />OB-OB-1988 <br />AU G 15 1988 <br />Mined Land Reclamation Division MINED LAfJD <br />`t23 Centennial Bldg RECLAMATION DI`J151CN <br />1313 Sherman Street <br />Denver, CD 80203-2272 <br />Sunland Mining Corp Apex No.2 C-81-011 <br />To whom it may concern: <br />Second period 1988 monitoring of Irout Creek and the <br />Alluvial well was performed on 07-30-1988 at 11:10 am. The <br />results are as follows: <br />Dutside Air Temp: 26 C <br />Trout Greek: <br />pH 5.9 Electroconductivity 190 micro-mho <br />Salinity 0.0 Temperature 15.5 C <br />Flow 6.66 CFS <br />Alluvial Well: <br />pH 6.5 Electroconductivity 1`15 micro-mho <br />Salinity 0,0 Temperature 16 C <br />Elevation -7.0 Et <br />The third quarterly sediment pond inspection was <br />performed by Mr. Fred Kuchta on OB-0'l-BB, and the results were <br />reported to me by phone on the following day. The inspection <br />report is attached. <br />Yours µ` <br />David R. Canning <br />Vice-president <br />