Laserfiche WebLink
Pond N~ Po.yJ~ ~ RDA NPDES No. - Dd g" <br />Date of Inspection <br />EMBANKMENT- <br />1. Adequacy of the vegetative cover: xcellen Moderate, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, ery F None <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes No /~ <br />At the principal spillway inlet? Yes No ~ <br />4. Erosion of the downstream toe of the embankment? Yes No .~ <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yes No ii <br />Could this seepage cause potential instability? Yes No <br />Explain: <br />PRINCIPAL SPILLWAY <br />1. Is the principal spilhvay system in working order? Yes tr No <br />2. Is the inlet free of debris and restrictive material? Yes '~ No <br />3. Is the discharge outlet free of restrictive material? Yes V No <br />~. Is erosion occurring at the discharge outlet? Yes No 1/ <br />Evaluate the severity: E:tensive Moderate Just Starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spilhvay system capable of passing design storm discharge? <br />Yes '~ No <br />2. Does iC appear as if the emergency spillway has discharged water since the last inspection? <br />Yes No ~ <br />3. Is erasion occurring at any section of the emergency spillway? Yes No cr <br />Describe the eetent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? Yes __ No J _ <br />If yes, e.cplain_ <br />Please add any special comments cooceraing potentially dangerous problems oo the back of this <br />sheet! <br />Inspected by: <br />