Laserfiche WebLink
Yes No y <br />Yes No L- <br />Yes No L <br />5. Is seepage occurring through the dam? Yes No v <br />Could this seepage cause potential instability? Yes No <br />E,Yplain: <br />PRINCIPAL SPILLWAY <br />1. Is [he principal spillway system in working order? Yes //' No <br />Date of <br />EMBANKMENT <br />1. Adegitacy of the vegetative cover: cellent, <br />2. Erosion forming gullies: Extensive; <br />3. Is wave action causing erosion: <br />On the upstream embankment? <br />At the principal spillway inlet? <br />4. Erosion of the downstream toe of the embankment? <br />The cause of the erasion is attributed to: <br />2. Is the inlet free of debris and restrictive material? Yes ~ No <br />3. Is the dischazge outlet free of restrictive material? Yes .- No <br />4. Is erosion occurring at the discharge outlet? Yes No '~ <br />Evaluate the severity: Extensive Moderate Just Starting None <br />EMERGENCY SPILLWAY <br />I. Is the overall emergenry spillway system capable of passing design storm dischazge? <br />Yes ~ No <br />2. Does i[ appear as if the emergency spilhvay has dischazged water since the last inspection'? <br />Yes No L <br />3. Is erosion occurring at any section of the emergency spillway? Yes No ~ <br />Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />I. Has the design storage capacity of the reservoir been surpassed? Yes No~_ <br />If yes. explain: <br />Please add any special comments concerning potentially dangerous problems on the back of this <br />sheet! <br />Inspected by: /~6' Gv~~ti•~- <br />tJPDE$ No. D© ~/ <br />Moderate, Few, Poor <br />Some, ery Fe None <br />