Laserfiche WebLink
<br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />September 2004 Monthly Report. <br />Page 3 <br />Table 2 -September 2004 Tailing Disposal Area Piezometer Depth to Water <br />Measurements <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P6 9/29/04 D 72.46 0.00 <br />P7 9/29/04 D 92.50 0.00 <br />P8 9/29/04 96.78 97.51 0.73 <br />P9 9/29/04 71.73 72.30 0.57 <br />P10 9/29/04 57.61 58.30 0.69 <br />Pll 9/29/04 41.30 41.80 0.50 <br />P12 9/29/04 41.69 41.71 0.02 <br />P13 9/29/04 41.12 41.34 0.22 <br />P14 9/29/04 41.24 0.00 <br />P15 9/29/04 D 41.10 0.00 <br />The San Luis Mill facility demolition continued during the month. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0799 or Mr. Bill Lyle (303) 324-2630 or (970) 325-4482. <br />' cerely r"' `'' 1 <br />olio F. Madrid <br />Environmental Coordinator III <br />Cc: Bill Lyle <br />file <br />