Laserfiche WebLink
III IIIIIIIIIIIII III <br />~F, <br />SECTION 6.0 Livestock Pond Construction Through 1995 and <br />Proposed Approximate Locations for 1996. <br />This section updates the CDMG on the locations of all constructed livestock ponds at Trapper Mine <br />through 1995 and projects approximate locations for proposed pond construction in 1996 (see attached <br />maps). The average pond density for Trapper mined-land areas~will not exceed one pond per ten acres. <br />Table 6-1 describes the as-built pond density in association with the specific drainage areas. <br />In 1995, Trapper constructed one new livestock pond in the newly established portion of East Pyeatt <br />drainage eastern tributary. <br />Enclosed map 6-1 also shows proposed pond locations that may be constructed by Trapper to accom- <br />modate the optimum density for livestock or wildlife use on the reclaimed area. Approximately one pond <br />is proposed for construction in 1996 and should be completed by October 31. Table &2 describes the <br />projected approximate drainage area per pond following construction in 1998. <br />As has been the case with previous livestock pond construction, future stock pond construction will meet <br />applicable certification standards. <br />eoe, one <br />rdAC~95REPT8~ <br /> <br />