My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53526
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53526
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:56 PM
Creation date
11/20/2007 3:48:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
3/15/1996
Doc Name
Livestock Pond Contruction thru 1995 & Proposed Approximate Locations 1996
Section_Exhibit Name
Appendix W 1995 Report Section 6.0
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />~F, <br />SECTION 6.0 Livestock Pond Construction Through 1995 and <br />Proposed Approximate Locations for 1996. <br />This section updates the CDMG on the locations of all constructed livestock ponds at Trapper Mine <br />through 1995 and projects approximate locations for proposed pond construction in 1996 (see attached <br />maps). The average pond density for Trapper mined-land areas~will not exceed one pond per ten acres. <br />Table 6-1 describes the as-built pond density in association with the specific drainage areas. <br />In 1995, Trapper constructed one new livestock pond in the newly established portion of East Pyeatt <br />drainage eastern tributary. <br />Enclosed map 6-1 also shows proposed pond locations that may be constructed by Trapper to accom- <br />modate the optimum density for livestock or wildlife use on the reclaimed area. Approximately one pond <br />is proposed for construction in 1996 and should be completed by October 31. Table &2 describes the <br />projected approximate drainage area per pond following construction in 1998. <br />As has been the case with previous livestock pond construction, future stock pond construction will meet <br />applicable certification standards. <br />eoe, one <br />rdAC~95REPT8~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.