My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-28_PERMIT FILE - M2004067
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2004067
>
2004-10-28_PERMIT FILE - M2004067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 8:44:05 AM
Creation date
11/20/2007 3:48:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004067
IBM Index Class Name
Permit File
Doc Date
10/28/2004
Doc Name
112(c) New Appl
From
Clear Creek District Water Providers LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Banks and Gesso, LLC <br />Mine Eouioment <br />Equipment to be used on site is typical of any operating rock quarry. There will be one <br />or more tracked rock drills used in the preparations for blasting. Mobile equipment will <br />consist of graders, dozers and rubber tired front-end loaders. Either front-end loaders <br />will load material into a hopper for conveyance to the primary crusher or standard haul <br />units ranging in capacity from 35 to 50 tons will be used to move the shot rock from the <br />mine face directly to the primary crusher. The actual method of moving shot rock to the <br />primary crusher may change over time depending upon distances involved and what is <br />determined to be the most efficient method. <br />Load-out will initially be accomplished with rubber-tired front-end loaders that will take <br />the finished product stockpiles and load the material into over-the-road haul trucks. The <br />haul trucks will then proceed to a scale and then leave the site via the access road. <br />Once under full production (year three) it may become necessary to use load out bins to <br />conserve space in the loadout area. <br />A properly anchored trailer will be used for a combination office/scale house. Bottled <br />water will be used for employees and portable toilets will be used for sanitation. As the <br />operational areas of the overall site are expanded, equipment storage and repair <br />facilities will be constructed. <br />Fuel and oil needed for equipment will be stored in above ground containers appropriate <br />for such use. Used petroleum products will also be stored in such containers and <br />removed periodically from the site for recycling. This storage will be isolated to a <br />specific area and appropriate spill prevention measures will be taken. A Spill Prevention <br />Control and Countermeasures Plan (SPCC) will be filed with the appropriate State <br />agencies. <br />Commodities and Intended Use of Incidental Products <br />The purpose of this rock quarry is to produce specification aggregates. There will be no <br />"incidental products" produced in this operation. <br />Clear Creek District Water Providers, LLC October 25, 2004 <br />MMRR Ouarry 11 03047 <br />
The URL can be used to link to this page
Your browser does not support the video tag.