Laserfiche WebLink
99 • LIMITED QviPACT (I I O) OPERATION • 5/6 <br />EXHIBIT D <br />RECLAMATION PLAN <br />6.3.4 Reclamation Plan <br />(1) See Reclamation Plan Rule 3.1 <br />(a) Overburden will not be replaced. Reclamation will be done at final depth <br />of pit and will be topsoiled and seeded. <br />(b) Slopes will be sloped 3:1 <br />(c) (i, ii, iii, iv, v, vi)Topsoiled, disced and seeded in compliance with <br />USSCD <br />(d) See Exhibit C under "Topsoil" <br />(e) Does not apply <br />(f) Unit cost per yard is $1.75 (haul and push combination) <br />Topsoiling: <br />~ 600 ft. X 560 ft. = 100,000 cu. ft. = 3,733 cu. yd. <br />3,733cu. yd. X $1.75 per yd. =.56,53.? <br />Seeding: <br />600 ft. X 560 ft. = 336,000 sq. ft. = 7.5 acres <br />7.5 acres @ 12 lbs. per acre = 91.5 lbs. <br />91.5 lbs. seeds @ $8.00 per acre = 5732.00 <br />Application of Seed: <br />7.5 acres @ $80.00 per acre =5'600.00 <br />(2) Costs are included in the price per acre <br />(3) Does not apply <br />(4) <br />6.3.5 EXHIBIT E -Map <br />