My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53380
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:50 PM
Creation date
11/20/2007 3:45:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification of Report Phase IV
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 2002 -43- 003-2203 <br /> <br /> <br /> <br />vacuum of not less than 5 psi. Poly-Flex and Golder observed the action of the vacuum on the <br />seam for a minimum often seconds. Each consecutively tested seam length was overlapped a <br />minimum of 3 inches. If soap bubbles appeared, Golder marked and documented the leak <br />location. Poly-Flex then repaired the leak and vacuum tested the repair. This procedure was <br />also followed to test extrusion repairs and extrusion patches. <br />The seam non-destructive test summaries (fusion pressure tests and extrusion vacuum tests) are <br />presented in Appendix K-9. <br />6.2 Leak Detection Trench and Underdrain Geosynthetics <br />Conformance testing for 40-mil smooth LLDPE geomembrane used to construct the LDTs is <br />presented in Appendix L-1. <br />Geomembrane in the LDTs was extrusion welded. Golder monitored trial seams, as described <br />in Section 6.1.3.1. Geotextile in LDTs and Underdrains was placed with a minimum overlap of <br />1 foot. <br />Conformance testing for the 40-mil LLDPE used for Phase IVa construction met specificafions. <br />6.3 Underground Workings Geosynthetics <br />Conformance testing results performed on geogrid used in the remediation of the underground <br />workings are presented in Appendix M. Golder monitored geogrid installation, including <br />construction of proper connections. <br />Conformance testing for geogrid used for Phase IVa construction met specifications. <br />1:10012201104W1CenRep0802100J220J.040004JgOtttdx Golder A55ociates <br />
The URL can be used to link to this page
Your browser does not support the video tag.