Laserfiche WebLink
Golder Associates Inc. <br />44 Union Boulevartl, Suite 300 <br />Lakewood, CO USA 80228 <br />Telephone (303) 980-0540 <br />Fax (303) 985-2080 <br />August 30, 2002 <br />Colorado Department of Natural Resources <br />Division of Minerals and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />_ Golder <br />-S <br />Our Ref: 003-2203 <br />RECEIVED <br />SEP U 3 700p <br />division ~{Minerals and Geaiogy <br />Attention: Berhan Keffelew, Senior Environmental Protection Specialist <br />RE: TRANSMITTAL OF THE FINAL REPORT CRESSON PROJECT QUALITY <br />ASSURANCE MONITORING AND TEST RESULTS PHASE IVA VALLEY <br />LEACH FACILITY COMPLETION TELLER COUNTY, COLORADO <br />Dear Mr. Keffelew: <br />Golder Associates Inc. is transmitting one original and two copies of the report entitled <br />"Final Report Cresson Project Quality Assurance Monitoring and Test Results Phase IVa <br />Valley Leach Facility Completion Teller County, Colorado." The report consists of two <br />volumes each; Volume T contains the report text, tables, figures, record drawings, and <br />Appendices A through D; Volume II contains Appendices E through N. <br />Note that the report is complete with the exception of the 28-day concrete strength for the <br />42-inch CSP wing walls. Replacement tables and certification page will be submitted when <br />these results aze received. <br />If you should have any questions or comments regazding this submittal, please contact me at <br />{303) 980-0540. <br />Sincerely, <br />COLDER ASSOCIATES INC. <br />John F. Lupo, Ph.D., P.E. <br />Sr. Project Manager <br />JL/bc <br />I.\W\2203\0100\0032203.010004861 DOC <br />OFFICES ACROSS ASIA. AUSTRALASIA, EUROPE, NORTH AMERICA. SOUTH AMERICA <br />