Laserfiche WebLink
QUARTERLY SAE INSPECTION REPORT <br />Pond Identification <br />Location <br />Status During Inspection <br />Approximate Water Level <br />Sediment (% total storage) <br />Outflow (cfs) <br />Features <br />Erosional <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />Structural <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />purtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Other <br />al Comments <br />Required: <br />Permit Reference <br />oflnspector: Jim Stover <br />CAM Mining LLC Quarter: <br />Mun er Can on Mine C-81-020 Inspection <br />I SAE 1 I SAE 2 I SAE 3 I SAE 5 I Sediment Pond II <br />N/A D N/A N/A D <br />N/A 0% N/A N/A 0% <br />N/A 0 N/A N/A 0 <br />No No <br />No No <br />No No <br />SAE-4 -Topsoil is no longer required. See Volume V, Appendix M(viii)-4 <br />Vegetation is adequate to control orosion. <br />SAE-1, 3 & 5 were removed during the quarter by the Munger reclamation project. <br />None <br />O6seo® <br />~oPpO REC/°. <br />o ~ e•..E.,st <br />Volume V, Appendix M (viii), & Volume II Figure 2.2~4p~O' F,S STOG~Q~o® <br />~ V iF ~~UQLr^'. o <br />E. 1 <br />... <br />