My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23329
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23329
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:53 PM
Creation date
11/20/2007 3:44:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Hydrology
Doc Date
4/30/2002
Doc Name
well abandonment
From
BLM
To
KERR COAL CO
Permit Index Doc Type
CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 <br />7 methods will be allowed for the plugging and abandonment of the drillholes that intercepted <br />federal coal resources: <br />Reaming or re-drilling of drill hole of original diameter to TD, then circulate up cement <br />(or approved sealing clay mud) from TD to surface. <br />?: The submittial and approval of cement bond log (or similar sonic log) showing full <br />contact and sealing of wellbore annulus with existing casing, then circulate up cement (or <br />approved sealing clay mud) from TD within existing PVC casing. <br />3: Pulling of full length of casing to TD, then cement (or approved sealing clay mud) <br />circulated up from TD to surface through existing borehole. <br />4: [f entire casing will not pull free, then free point determined, casing parted at free point, <br />and free casing pulled. If the free point is "essentially" (to be determined on a well by <br />well basis by BLM) in, or at the top of the coal seam, cement (or approved sealing clay <br />mud) will then be circulated from TD in casing to surface through existing well hole. <br />As 4, but if free point is NOT "essentially" in or at the top of coal seam, then reaming or <br />re-boring of well to TD, with cement (or approved sealing clay mud) circulated up from <br />TD to surface. <br />6: Pumping of fine neat cement (or approved sealing clay mud) through slotted casing, <br />followed by flushing of existing casing, then mm~ing log as described in method 2, <br />showing full contact and sealing of outside of casing. With BLM approval of positive <br />results, interior of casing will be then cemented (or filled with approved sealing clay <br />mud). If results are not positive for full contact and sealing, hole will need to be re-bored <br />per method 1, through young, weak cement. <br />7: A combination of the above methods, approved on a well by well basis by BLM. <br />
The URL can be used to link to this page
Your browser does not support the video tag.